Pool Construction

Home >> Pool Construction
Audio Accounts Products Images

Pool Cross Section

Here is what is included with our construction of your new in-ground pool:

  • 12"/3000 Pound Test reinforced Concrete Wall
  • Four (4) Perimeter Steel Reinforcing Rods
  • 1/4" Protective Foam Padding On Walls
  • Cement Pool Bottom
  • Durable 28 mil Vinyl Liner
  • Automatic Surface Skimmer with Collar & Vacuum Plate
  • Bottom Drain
  • Two (2) Return Lines
  • PVC Fittings
  • 100 Pound Test Poly Hose
  • Hayward DE filter or High-Rate Fiberglass Sand Filter w/6-way valve
  • Hayward 1 HP Super Pump with Mounting Base
  • Dual Suction Manifold
  • Backwash Hose
  • 3-Step Stainless Steel Ladder with Anchor Sockets & Escutcheon Plates
  • 8' Fiberglass Diving Board with Hardware
  • Deluxe Fiberglass Diving Board Stand
  • 500 Watt Underwater Light
  • Vacuum Cleaner with Telescoping Pole
  • Vacuum Hose
  • Nylon Brush with Pole
  • Leaf Net with Pole
  • Rope & Float Life Line
  • Life Ring
  • Thermometer
  • Test Kit

NOT INCLUDED:

  • Water to Fill Pool
  • Electrical Wiring
  • Permits
  • Blasting
  • Additional Fill (Allowance 32 yards)

Click here for a virtual tour of your liner options.
Click here to view our Pool Construction Gallery.